E13 | Concord Country Cape | Race to the Finish
Season 43 Episode 13 | 23m 42s | Video has closed captioning.
Tom Silva talks about the different types of underlayment used for the roof. Charlie Silva, Kevin O'Connor, and Mark McCullough install an oak mantle. Mark corrects problems with the fireplace brickwork. Richard Trethewey and plumber Abe Bilo disassemble the old boiler to be replaced with a new wall-mounted boiler. Mauro Henrique paints the exterior clapboards inside. A linear drain is installed.
Aired: 01/06/22
Expired: 01/20/22
Problems Playing Video? | Closed Captioning